Home / Troubleshooting / DS 5 Outdoor Snow Melting Controller

After a deicing cycle is complete my pavement still has some snow on it. Why?


DS 5 Outdoor Snow Melting Controller

You should try adjusting the Delay Off cycle on your outdoor controller to be longer to allow the de-icing system time to clear all of the snow and dry the surface.

The Delay Off adjustment 12 o’clock position is 30 minutes moving to 90 minutes at 3 o’clock.

If this does not solve the problem or if snow removal is patchy, check to see if the de-icing system itself is working properly.