Home / Wiring / GIT-1

How to Complete an Effective GIT-1 Installation


GIT-1

Gutters:

Position sensor within ¼” of the gutter bottom with moisture sensing grid facing downstream (ambient facing upstream). Then, fasten the sensor to the fascia using mounting clamps and gasket screws.

fascia GIT-1 Installation

Downspouts:

Fold cable back parallel to sensor body and secure with mounting clamps. Then, suspend sensor in downspout with moisture sensing grid facing up (ambient facing down).

Read more about GIT-1 on Warmupedia and more on Controls for Heated Driveways and Sidewalks Controls.